Background
Our client, a highly regarded organization in the UAE, embarked on an ambitious greenfield project in Abu Dhabi, aiming to produce 650 tonnes of duplex board paper daily. This initiative required the establishment of a comprehensive Effluent Treatment Plant (ETP) that was both robust and compliant with stringent local regulatory standards. A significant challenge encountered during this project was the high calcium content present in the effluent, which posed a risk to the effectiveness of the biological treatment processes.
Solution
To address these challenges, CleanEdge Resources developed an advanced, multi-stage treatment solution tailored to meet the project’s specific needs:
To specifically address the issue of calcium deposition in the effluent, a modified buffer tank equipped with a calcium removal system was integrated. This modification ensured that the biological treatment efficiency was not compromised. Furthermore, the introduction of floatable mixers in the equalization tank enhanced overall treatment performance.
The biogas produced from the LESAR Bio Digester is utilized as fuel for the boiler, leading to significant cost savings for our client. This comprehensive approach not only addressed regulatory compliance but also optimized operational efficiency, positioning the project as a benchmark for sustainable practices in the industry.
Inlet and Outlet Parameters